BOARDWALK EXTENSION TO HARVEY DESIGN Location: Breakers Park to Harvey Avenue
The city approved design, permitting, bidding assistance and construction administration for a 295- foot extension of the boardwalk and seawall from Breakers Park south to Harvey Avenue, including survey, geotechnical investigations, environmental assessments and technical specifications.
CRA Expenditure: $170,237.50
MAIN STREET STREETSCAPE DESIGN (Completed 2025) Location: Peninsula Drive to the beach The streetscape project developed illustrative cross- sections of the streetscape reflecting various design and cost options for future construction.
CRA Expenditure: $59,100
146 & 148 S. GRANDVIEW (FY2024–2025) Location: 146 & 148 S. Grandview Avenue Roofing, windows replacement, exterior painting, fascia and gutters, railings, mold remediation, interior cleaning, concrete stairs, termite fumigation and other property opportunity.
MAIN STREET STREETSCAPE <<
CRA Expenditure: $34,811.50
EAST ISB STREETSCAPE (2022,2023,2025) This safety and beautification project, led by FDOT, upgraded eight blocks of roadway between Halifax and Atlantic avenues. The city completed the undergrounding of power and secondary power conversions as part of the corridor improvements.
CRA Contribution: $102,612.70 $52,911.10 (2022) | $44,758.44 (2023) $4,943.16 (2025)
PROPERTY MAINTENANCE <<